Services

From the first sketch to dismantling.

We plan and build customised exhibition stands to your requirements – turnkey, on time and across Europe.

01Scope of services

What we take care of

  1. Pos. 01

    Concept & design

    Stand concepts that translate your brand into space – tailored to floor area, audience and budget.
    • Individual design solutions
    • Strategic consulting
    • Brand-led design
  2. Pos. 02

    3D visualisation & planning

    Detailed 3D visualisations and technical drawings show you the stand before it is built.
    • 3D visualisation
    • Technical drawings
    • Planning to exhibition organisers’ requirements
  3. Pos. 03

    System build with Octanorm

    Modular exhibition stands made from aluminium profiles – flexible, quick to assemble and dismantle, and reusable.
    • Quick assembly and dismantling
    • Reusable
    • Lightweight and stable
    • Extensive accessories
  4. Pos. 04

    Custom stand construction

    Made to measure from wood-based materials in our own production hall – maximum design freedom for exclusive appearances.
    • Creative freedom
    • Individual look
    • Stable and robust
    • Premium appearances
  5. Pos. 05

    Logistics & assembly

    Delivery, on-site assembly, support during the fair, and dismantling and removal once it ends.
    • Europe-wide transport
    • Professional assembly
    • On-time handling
    • Dismantling and removal
  6. Pos. 06

    Consulting & project management

    One dedicated contact from the first idea to the follow-up.
    • Strategic consulting
    • Project coordination
    • Follow-up support

View exhibition stand photos and visualisations · Answers about costs and planning times

02Construction methods

Two proven systems for every requirement.

Schematic illustration

Aluminium frame connection

Octanorm system

Modular system of aluminium profiles

  1. Aluminium profile
  2. Frame profile
  3. Connection

General construction principle, not a technical drawing.

Timber frame and wall panel

Conventional construction

Custom-made from wood-based materials

  1. Timber frame
  2. Wall panel
  3. Fastener

General construction principle, not a technical drawing.

Construction methods compared
CriterionOctanorm systemConventional construction
ConstructionModular system of aluminium profilesCustom-made from wood-based materials
StrengthsFlexible, fast and versatileMaximum design freedom for exclusive appearances
AssemblyQuick assembly and dismantlingStable and robust
MaterialReusable, lightweight and stableIndividual look, high-quality surfaces
EquipmentExtensive accessoriesSpecial builds and premium details
Ideal forSystem stands, shops and short-term projectsMajor brands and personalised designs

03 Process

A typical project timeline.

Ideally, we start two to three months before your fair. From initial concept to implementation, projects typically take four to eight weeks – less for urgent orders.

Weeks to the fairAll phases on one time scale. In this example, each phase follows directly after the previous one.
  1. Weeks to the fair-12 → -10

    Briefing and consultation form the starting point.

    Schematic illustrationA floor plan as the starting point for consultation and design.
  2. Weeks to the fair-10 → -7

    The concept is presented as a 3D visualisation.

    Schematic illustrationThe stand as a spatial concept.
  3. Weeks to the fair-7 → -5

    Technical planning is prepared for approval.

    Schematic illustrationDesign lines and dimension lines for technical planning.
  4. Weeks to the fair-5 → -2

    Production takes place in the production hall.

    Schematic illustrationSeparated components as a schematic production detail.
  5. Weeks to the fair-2 → Fair

    Logistics and assembly bring the stand together on site.

    Schematic illustrationThe components come together as a stand section.
  6. Weeks to the fairFair → +1

    Support continues during the fair.

    Schematic illustrationThe complete stand section during the fair.
  7. Weeks to the fair+1 → +2

    Dismantling and removal follow the fair.

    Schematic illustrationThe stand section separates into components.

Example timeline. Actual durations depend on the size and complexity of the project.

A schematic stand detail illustrating the project process.

04Applications

Professional stands for every occasion and budget.

  • 01

    System stands

    Modular stands with the Octanorm system – economical, flexible and suitable for any stand size.

  • 02

    Custom builds

    Individual constructions from wood-based materials for brands with high expectations.

  • 03

    Mobile solutions

    Lightweight systems that are quick to set up for changing locations.

  • 04

    Shops & short-term projects

    Presentation spaces that can be realised quickly and reused.

Planning a trade fair appearance?

Tell us about your fair, your floor space and your date. We will get back to you with an initial assessment – without obligation.